Which road gets you into Biscuit Run Park? Albemarle County's largest park covers nearly 1,200 acres between 5th Street and Scottsville Road, so for anyone in Southside it can feel close from more than one direction. The public entrance is only on one side, off Route 20.
For people at the Villas at Southern Ridge, that makes every walk at Biscuit Run a Scottsville Road outing. It also means the park visit and some of the season's most family-friendly holiday events in Southside are on the same stretch of road. Winter is a good time to plan around that, because the 5th Street side of the park is scheduled to get its own way in during 2027.
The front door faces Route 20
According to Albemarle County's Biscuit Run Park page, the park's only public access is the eastern entrance at 2020 Scottsville Road. The trailhead there has 75 parking spaces, restrooms, and access to 8.5 miles of signed, maintained trails. The county also asks visitors not to park on or cross private property to reach the park. Neighborhoods that border the park on other sides are not entrances.
The entrance is fairly new. Phase 1A, the work that opened public access from Route 20, was substantially complete on December 14, 2024. This December makes two winters of public use, and the park is still being built around its visitors. The county says several construction zones are active, a number of trails are temporarily closed, and visitors should stay alert and follow posted signs. A trail that was open on your last visit may be closed on the next one. Check the county's trail map before you go, but trust the signs at the trailhead over your memory.
Some of that construction is close to the entrance. Crews started building two irrigated, regulation-size natural grass athletic fields near Route 20 in February 2026. The project includes a longer park access road, new parking lots, and new restrooms, and the county tentatively scheduled it for substantial completion in fall 2026. The area around the trailhead may look different from one visit to the next this winter.
Mountain bikers have their own destination inside the park. Biscuits + Gravity is a bikes-only downhill and skills area with jump lines and a mini pump track. Its trails are designed so riders can progress from beginner to advanced. The Charlottesville Area Mountain Bike Club funded its construction, and the county says most of the downhill trails and features are complete and open. A kiosk, entry and exit portals, and other additions were scheduled for summer 2026 through a partnership with the University of Virginia School of Architecture's Design-Build Studio.
Down the same road, a holiday calendar that is mostly free
Since you are already on Route 20, Eastwood Farm and Winery is close by at 2531 Scottsville Road, on the same road as the trailhead. Its November and December 2026 holiday lineup runs from the week before Thanksgiving to the Sunday before Christmas. Admission is free for every event except the wreath workshop. Reservations are not required, and all ages are welcome.
Date | Event | Time | Notes |
|---|---|---|---|
Sunday, Nov. 22 | Wreath Making Workshop with M. Henry Design | 12 to 2 p.m. | Ticketed; on the covered, enclosed Veranda |
Saturday, Nov. 28 | Mini Makers Holiday Market | 1 to 4 p.m. | Gifts made and sold by local kids; Veranda |
Saturday, Dec. 5 | Holiday Carols with Brian Franke | Evening | Indoors |
Sunday, Dec. 6 | Santa visit | See winery calendar | Indoors; no cost |
Thursday, Dec. 10 | Music Bingo: Holiday Edition | 6 to 8 p.m. | Indoors |
Saturday, Dec. 12 | Holiday Market, carols with Sharif | 12 to 4 p.m.; carols 12:30 to 3:30 | Planned outdoors |
Sunday, Dec. 13 | Santa visit | See winery calendar | Indoors; no cost |
Saturday, Dec. 19 | Holiday Carols with Sue Harlow | Evening | Indoors |
Sunday, Dec. 20 | Santa visit | See winery calendar | Indoors; no cost |
A few details are useful for planning. Eastwood says the wreath workshop sells out every year, and tickets are sold through Eventbrite. The Santa Sundays are indoors, and families take their own photos. Milk and cookies flights for kids come back for those Sundays and for the Mini Makers market. The December 12 Holiday Market is the only event on the list planned for outdoors, so dress for the weather.
The weekly music schedule keeps going between holiday events. Eastwood hosts live performers Thursday and Friday nights and many Sundays. Saturdays have a quieter afternoon set plus Eastwood After Dark from 5 to 8 p.m. A Saturday walk can start at the trailhead and end at fire pits with mulled wine and s'mores, five miles from the Downtown Mall.
Why the drive around is temporary
The Route 20 routine has an end date because the county is building access from the 5th Street side. In March, WVIR reported that construction started March 2 on a 220-foot pedestrian bridge. The bridge will cross the creek that separates the park from residential areas off 5th Street, including Southwood. The county said the project includes ADA-compliant access and a second entrance. In that WVIR report, Jim Barbour of Albemarle Parks and Recreation named the access points the county has in mind: "whether it's from Route 20 here, Old Lynchburg Road, on the other side of town hopefully from Wegmans in the near future, 5th Street Station."
Here is where each 5th Street-side project stands on the most recent published schedules:
- Hickory Street entrance. This second public entrance in the northern part of the park has been under construction since February 2026.
- Southwood pedestrian bridge. Construction started March 2, 2026. The Piedmont Environmental Council's summer 2026 update says the bridge, its trails, and the Hickory Street entrance are expected to be finished in early 2027.
- Boardwalks and trail extension. Three boardwalks and an addition to the multi-use trail network started in 2025, and the county expects them to be complete in 2026.
- 5th Street Station Trail and Hub. VDOT lists this $9.9 million project as coming soon. Construction is to be advertised in fall 2026, with an estimated start in late 2026 and completion in late 2027. VDOT notes the schedule may change. The county says the hub will provide bike and pedestrian access to the park from the Rivanna Trail and the 5th Street Station area.
The full greenway from 5th Street Station into the park depends on more than construction crews. The county's Biscuit Run Greenway project page says the trail needs separate easements from the Mill Creek and Foxcroft homeowners associations before design and buildout can move forward. In May, infocville reported that the county had taken ownership of donated land for the trail hub. The Board of Supervisors approved a temporary construction easement on May 20, and county staff were still negotiating with VDOT for permission to build the trail under I-64.
Of the projects that add a new way into the park, the bridge and the Hickory Street entrance are expected to finish first, in early 2027, and the trail hub's estimated completion is late 2027. Until then, every visit to Biscuit Run starts at 2020 Scottsville Road, and Eastwood is down the same road at 2531.
The agents at Nest Realty track projects like the Southwood bridge and the 5th Street Trail Hub because they change how Southside neighborhoods connect to the places around them. If you want to talk through how these new connections affect your part of 5th Street, we're glad to help. Get Started Now.